CHINA · TONGLIAO CITY · 2026

Wulijimuren River HDD Work for Changchun–Shijiazhuang Natural Gas Pipeline Project (Changling–Zhangjiakou Section)

Selected Project Experience

PROJECT OVERVIEW

Wulijimuren River HDD Work for Changchun–Shijiazhuang Natural Gas Pipeline Project (Changling–Zhangjiakou Section)

OD1422 mm × 1,203 m large-diameter land-to-land HDD crossing.

Scope of Work

Pipe Diameter: OD1422mm steel Pipe Crossing Length: 1,203 m Crossed Formation: Silty Clay, Fine Sand, Silt Equipment: GSE10000-L HDD Rig with1000 tonnes pullback force , 2 sets of mud pump, mud recycling system, Thruster

Project Technical Data

Location CHINA · TONGLIAO CITY · 2026
Installation Method Land-to-Land HDD
Pipe Diameter OD1422 mm
Crossing Length 1,203 m
Completion Date September 2026