BANGLADESH · 2019

Landfall HDD Works for Single Point Mooring (SPM) Facility and Dural Offshore Pipline System for Eastern Refinary of Bangladesh

Selected Project Experience

PROJECT OVERVIEW

Landfall HDD Works for Single Point Mooring (SPM) Facility and Dural Offshore Pipline System for Eastern Refinary of Bangladesh

Six HDD crossings: OD914 mm × 2 and OD457 mm × 4; combined length approximately 10 km. Completed by December 2019.

Scope of Work

Pipe Diameter: OD914 mm & OD457 mm steel pipelines Longest Single Crossing Length: 1,770 m Accumulated Crossing Length: 6 crossings in total of ~10 km Crossed Formation: Fine sand, silty clay, silt Equipment: GS4000-L HDD Rig with 400 tonnes pullback force , 2 sets of mud pump, mud recycling system, offshore barges

Project Technical Data

Location BANGLADESH · 2019
Installation Method Offshore Landfall HDD
Pipe Diameter OD914 mm × 2; OD457 mm × 4
Crossing Length Approximately 10 km combined
Completion Date December 2019