PHILIPPINES · MANILA · 2026

Pipejacking Work for Manila 1200mm Submarine Line – Eastbay Phase 2, Central Bay Project (Package 3)

Selected Project Experience

PROJECT OVERVIEW

Pipejacking Work for Manila 1200mm Submarine Line – Eastbay Phase 2, Central Bay Project (Package 3)

DN1800mm reinforced concrete pipe casing installation by pipe jacking method.

Scope of Work

Pipe Diameter: OD1800mm Reinforced Concrete Pipe Single Drive Length: 238 m Crossed Formation: Highly weathered rock with boulders, medium to coarse sand, and interbedded silty clay.

Project Technical Data

Location PHILIPPINES · MANILA · 2026
Installation Method Microtunnelling / Pipejacking
Pipe Diameter DN1800mm reinforced concrete pipe
Crossing Length 238 m
Completion Date January 2026
← All Projects
Pipejacking Work for Manila 1200mm Submarine Line – Eastbay Phase 2, Central Bay Project (Package 3)