PROJECT OVERVIEW
← All Projects
HDD Work for Changzhi City Natural Gas Rehabilitation Project
OD219 mm × 1,800 m HDD crossing through slightly weathered limestone.
Scope of Work
Pipe Diameter: OD219mm steel pipe Crossing Length: 1,800m Crossed Formation: Limestone
Project Technical Data
Location CHINA · CHANGZHI CITY · 2024
Installation Method Land-to-Land
Pipe Diameter OD219mm
Crossing Length 1,800m
Completion Date May 2023