CHINA · GUANGXI · 2025

Landfall HDD Work for 220kV Weizhou Island Cross-Sea Grid Interconnection Project

Selected Project Experience

PROJECT OVERVIEW

Landfall HDD Work for 220kV Weizhou Island Cross-Sea Grid Interconnection Project

OD630 mm × 830 m steel pipe landfall HDD crossing.

Scope of Work

Pipe Diameter: OD630mm steel Pipe Crossing Length: 830 m Crossed Formation: Silty soil,Moderately weathered basalt,Coral reef formations Equipment: GS4000-L HDD Rig with 400 tonnes pullback force , 2 sets of mud pump, mud recycling system

Project Technical Data

Location CHINA · GUANGXI · 2025
Installation Method Offshore Landfall HDD
Pipe Diameter OD630mm
Crossing Length 830 m
Completion Date December 2025
← All Projects
Landfall HDD Work for 220kV Weizhou Island Cross-Sea Grid Interconnection Project