CHINA · NINGXIA · 2023

Guozigou HDD Crossing for the Third West-East Gas Pipeline Project (Guozigou Gully Crossing at Piles AC121~AC122 in Tongxin County)

Selected Project Experience

PROJECT OVERVIEW

Guozigou HDD Crossing for the Third West-East Gas Pipeline Project (Guozigou Gully Crossing at Piles AC121~AC122 in Tongxin County)

OD1219 mm × 1,044 m HDD crossing through Malan Loess and Lishi Loess.

Scope of Work

Pipe Diameter: OD1219mm steel Pipe Crossing Length: 1,044 m Crossed Formation: Malan Loess, Lishi Loess Equipment: GSE6000-L HDD Rig with 600 tonnes pullback force , 2 sets of mud pump, mud recycling system

Project Technical Data

Location CHINA · NINGXIA · 2023
Installation Method Land-to-Land HDD
Pipe Diameter OD1219 mm
Crossing Length 1,044 m
Completion Date April 2023
← All Projects
Guozigou HDD Crossing for the Third West-East Gas Pipeline Project (Guozigou Gully Crossing at Piles AC121~AC122 in Tongxin County)