Pipejacking Work for Effluent Discharge Pipeline Project for Tangxun Lake Wastewater Treatment Plant, Wuhan
DN4000mm Sewer Pipeline Pipejacking Project
Scope of Work
Pipe Diameter: DN4000 mm reinforced concrete pipe Jacking Lengths (3 Drives): 724 m, 1,540 m, and 1,509 m Crossed Formation: Rock Stratum, Soil Layer, and Sand Layer
Project Technical Data
Location CHINA · WUHAN CITY · 2021
Installation Method Microtunneling / Pipejacking
Pipe Diameter OD4000 mm
Crossing Length 724m, 1,540m, 1509m
Completion Date December 2021